Support Timing Evaluation for Rockburst Mitigation in Deep-Buried Hard Rock Tunnels: A Framework Integrating Stress and Energy Analyses
Аннотация
Excavation of deep-buried hard rock tunnels is prone to inducing rockbursts. Under plateau high-energy geological conditions, the underlying mechanisms of rockburst initiation and methods for determining optimal support timing remain insufficiently understood. To address this issue, this study proposes a support timing analysis method based on stress and energy control principles. By introducing the stress release ratio and the overall displacement release coefficient, a mapping relationship is established between the stress and energy evolution characteristics of the surrounding rock and the position of the tunnel face advancement. Based on 3D numerical simulations of tunnel excavation, the influences of the stress release process and the lateral pressure coefficient on the stress and energy evolution paths of the surrounding rock are analyzed, and corresponding criteria for determining support timing are defined. The results indicate that excavation-induced stress and energy evolution exhibit distinct stages, and support should be applied before the peak energy state and before rapid damage development. In conjunction with a plateau tunnel case study, the simulated plastic dissipation zone is concentrated at the crown, consistent with field observations. Its depth of approximately 0.57 m is comparable to the field rockburst crater depths of 0.60–0.70 m, defined as the maximum depth of rockburst-induced material loss relative to the excavation contour. The calculated latest support timing corresponds to the tunnel face advancing approximately 1.1 m beyond the target section, which agrees well with the observed rockburst occurrence positions (0.2–0.8 m).