Scale-Dependent Elasticity and Structural Patterns of Wetland Restoration Costs

Zha, Dongping
Springer Nature · 2026-10-05 · DOI 10.1007/s13157-026-02139-3

Аннотация

In China, wetland restoration projects are typically costed using simple linear averaging methods, which may obscure scale-dependent cost variation and heterogeneity related to technical pathways and management modes. This study analyzes 21 domestic wetland restoration projects, after excluding two outliers from an initial dataset of 23, using a log-linear regression model to estimate the scale elasticity between unit costs and restoration area. Robustness is verified through leave-one-out cross-validation, bootstrap resampling, and White’s HC3 correction. The results reveal pronounced economies of scale. The elasticity coefficient of unit cost with respect to area is β = − 0.778 ( p < 0.001, R² = 0.755), indicating that each 1% increase in area reduces unit cost by about 0.78%. After accounting for technical-pathway heterogeneity, the scale elasticity remained significantly negative ( β = − 0.700, HC3 p = 0.005). Descriptively, ecological restoration projects had the lowest average unit cost, at 4,803 CNY/mu (10,528 USD/ha), while engineering-intensive projects had the highest average unit cost, at 23,959 CNY/mu (52,513 USD/ha). Moreover, unit costs generally declined with increasing project scale, with significant differences across the predefined scale groups (Kruskal–Wallis p < 0.001). Projects ≥ 500 mu generally exhibited lower unit costs, although the available sample did not support identification of a unique optimal upper threshold. These findings provide a practical basis for project bundling, budgeting, and policy formulation to enhance cost efficiency and ecological product value realization in wetland restoration. 中国湿地修复项目成本测算普遍采用线性平均方法, 难以反映项目规模变化对单位成本的影响, 也难以揭示不同技术路径和管理模式下的成本异质性. 本文以23个国内湿地修复项目为初始样本, 剔除2个异常值后保留21个项目, 采用对数线性回归模型分析单位成本与修复面积之间的规模弹性, 并通过留一法交叉验证, Bootstrap重抽样和White HC3校正检验模型稳健性. 结果显示: 湿地修复项目具有显著的规模经济效. 单位成本相对于修复面积的弹性系数为 β =−0.778( p < 0.001, R² =0.755), 修复面积每增加1%, 单位成本平均下降约0.78%. 在进一步考虑不同技术路径差异后, 单位成本与修复面积之间的规模弹性仍显著为负 (β = − 0.700, HC3 p = 0.005). 从不同技术路径的成本比较来看, 生态修复类项目的平均单位成本最低, 为4,803元/亩 (10,528美元/公顷);工程密集型项目的平均单位成本最高, 为23,959元/亩 (52,513美元/公顷). 总体来看, 随着项目规模扩大, 单位成本呈下降趋势, 不同规模组之间差异显著 (Kruskal–Wallis p < 0.001). 其中, 修复面积大等于500亩的项目总体单位成本较低, 但现有样本尚不足以确定唯一的最优规模上限. 研究结果可为湿地修复项目的统筹实施, 预算编制和政策制定提供依据, 并为提高修复资金使用效率和推动生态产品价值实现提供参考.

Читать у издателя →